MEGA BLOCK on
18.5.2014
Central Railway
will operate Mega Block on its suburban sections for carrying out maintenance
work on Sunday 18.5.2014.
THANE-KALYAN DN
SLOW LINE FROM 11.00 AM TO 3.30 PM
All DN
slow/Semi-fast locals leaving Mulund from 10.39 am to 3.22 pm will be diverted
on DN fast line between Mulund and Kalyan stations halting at Thane and
Dombivli stations during the block period.
All DN fast locals
leaving CST from 10.08 am to 2.40 pm will halt at Ghatkopar, Vikhroli, Bhandup
and Mulund stations in addition to their respective halts and will arrive
destination 15 minutes behind schedule.
All UP fast line
Locals leaving Thane from 10.50 am to 3.36 pm will halt at Mulund, Bhandup,
Vikhroli, Ghatkopar and Kurla stations in addition to their respective halts
and will arrive destination 15 minutes behind schedule.
All slow locals
arriving/leaving Chhatrapati Shivaji Terminus from 10.00 am to 4.00 pm will and
arrive destination 15 Minutes behind schedule.
DN locals will not
available at Kalva, Mumbra, Diva, Kopar & Thakurli stations. Passengers of
these stations are permitted to travel via Kalyan/Dombivli/Thane stations
during the block period.
PANVEL-NERUL UP
& DN HARBOUR LINES FROM 11.00 AM TO 3.00 PM
All UP Harbour line
services between Panvel and Nerul leaving Panvel from 10.43 AM to 3.27 PM and
DN Harbour Line services between Nerul and Panvel leaving Nerul from 10.41 AM
to 3.17 PM will remain suspended during the block period.
All UP Panvel Thane
Trans-Harbour line locals between Panvel and Nerul stations leaving Panvel from
11.05 AM to 3.19 PM and DN Thane Panvel Trans-Harbour locals between Nerul and
Panvel stations leaving Nerul from 11.42 AM to 2.48 PM will remain suspended
during the block period.
Panvel-Andheri
locals will remain cancelled during the block period. Special locals will run on
Chhatrapati Shivaji Terminus Mumbai-Nerul and Thane-Nerul sections of
Trans-Harbour line during the block period.
No comments:
Post a Comment