Central Railway will
operate Mega Block on its suburban section for carrying out maintenance work on
Sunday 11.5.2014.
BYCULLA-VIDYAVIHAR
DOWN SLOW LINE FROM 11.20 AM TO 3.20 PM
Dn slow line services
leaving Byculla from 11.04 am to 3.21 pm will be diverted on Dn fast line
between Byculla and Vidyavihar stations, halting at Parel, Dadar, Matunga, Sion
and Kurla stations and further will be re-diverted on Dn slow line proper.
Up fast line services
leaving Thane from 11.21am to 3.25 pm will halt at Mulund, Bhandup, Vikhroli,
Ghatkopar and Kurla stations in addition to their respective scheduled halts
and will arrive destination 15 minutes behind schedule. Dn Fast line services
leaving Chhatrapati Shivaji Terminus from 11.15 am to 2.51 pm will halt at
Ghatkopar, Vikhroli, Bhandup and Mulund stations in addition to their
respective scheduled halts and will arrive destination 20 minutes behind
schedule.
All slow locals
arriving and leaving Chhatrapati Shivaji Terminus between 11.00 am and 4.00 pm
will arrive/leave destination 10 minutes behind schedule.
NO BLOCK on HARBOUR
LINE
As a result of this,
suburban trains are likely to be more crowded than usual. Passengers are
requested not to take any risks while travelling. They are also requested to
avoid travelling on foot board, roof top of locals and not to board extremely
over crowded trains. Passengers are requested to bear with the Railway
Administration for the inconvenience caused.
No comments:
Post a Comment